Production run
Not startedSource: Run status normalization query
State inferred from the selected production output directory.
Data Analytics dashboard
Published snapshot of software readiness, production progress, and validated reference results.
The software path is ready, but the production run has not started. This host is below the handoff's recommended production capacity, so use a larger machine for the primary configuration.
Production run
Not startedSource: Run status normalization query
State inferred from the selected production output directory.
Run progress
0%Source: Run status normalization query
Attempted trust-region steps divided by the configured total.
Reference Q · 10 mirrors
216.86Source: Packaged reference-validation query
Current six-mirror production Q when available; otherwise the labeled ten-mirror reference Q.
Reference Purcell proxy
63.04Source: Packaged reference-validation query
Electric-energy/modal Purcell proxy; not vacuum-normalized.
Reference air overlap
51.7%Source: Packaged reference-validation query
Local modal electric-energy participation in air around the atom region.
| # | Check | Status | Evidence |
|---|---|---|---|
| 1Source: Preflight readiness query | Archive integrity | Pass | 55 packaged files match SHA-256 manifest |
| 2Source: Preflight readiness query | Automated tests | Pass | 20 tests passed |
| 3Source: Preflight readiness query | Checkpoint and resume | Pass | Smoke runner resumed through 2 attempted steps |
| 4Source: Preflight readiness query | Production dry run | Pass | 444,843 full edges; 55,606 estimated symmetry DOFs; 292 variables |
| 5Source: Preflight readiness query | Production host capacity | Warning | This host: 8 cores / 45.5 GiB RAM; recommended: at least 16 cores / 128 GiB RAM |
| Mirror cells per side | Q | Topology |
|---|---|---|
| 4 | 141.39 | Validated seed |
| 6 | 181.23 | Validated seed |
| 6 | 183.63 | After full-objective step |
| 8 | 203.52 | Validated seed |
| 10 | 215.74 | Validated seed |
| 10 | 216.86 | After full-objective step |
| Stage | Iterations | Projection β | Min air overlap | Max variable change |
|---|---|---|---|---|
| 1Source: Production continuation-stage query | 4Source: Production continuation-stage query | 1.5Source: Production continuation-stage query | 52%Source: Production continuation-stage query | 0.02Source: Production continuation-stage query |
| 2Source: Production continuation-stage query | 6Source: Production continuation-stage query | 3Source: Production continuation-stage query | 55%Source: Production continuation-stage query | 0.01Source: Production continuation-stage query |
| 3Source: Production continuation-stage query | 6Source: Production continuation-stage query | 6Source: Production continuation-stage query | 58%Source: Production continuation-stage query | 0.01Source: Production continuation-stage query |
The displayed mode volume and Purcell factor are electric-energy/modal proxies. Before making a quantitative physical claim, the handoff requires mirror-count validation, PML and mesh convergence, fabrication-robustness studies, material loss/dispersion, and homogeneous-space LDOS normalization.