2.5D LDOS cavity optimizerhoodlab · 780 nm

2026-08-17 · Symmetry-reduced, grid/domain-converged fixed-frequency launch gates

780 nm production optimizer qualification

accepted artifacts updated 2026-08-17 18:26 UTC

All five launch gates pass for the fixed-frequency 780 nm atom-coupling optimizer. Component-correct parity cuts the production system from 235,200 physical unknowns to 29,499, grid/domain changes are 0.36%/1.19%, and an exact-grid trial improves coupling. The exact production-grid Q diagnostic reports no pole in the target window.

Top-level gates
5/5
Diagnostic Q
no physical lower-half-plane pole in 0.995--1.005
System unknowns
235,200 → 29,499
Atom trial
1494.465 → 1495.989
Trial gain
+0.102%
Peak RSS
6.733

Decision. Proceed with the full fixed-frequency atom-coupling optimization on the qualified 40 x 70 x 28 configuration. Under the discovery cadence adopted on 2026-08-18, run the full Q diagnostic every tenth step and mark intervening checkpoints provisional; make no resonant-cavity claim until a physical 780 nm pole is independently reacquired.

780 nm production optimizer qualification
Accepted fixed-geometry y-grid and matched-PML domain convergence for the retuned production lead.
780 nm production optimizer qualification
Exact 40 x 70 x 28 production-grid, 81-point, seven-probe target-window diagnostic: an accurately resolved analytic background with no physical pole and therefore no numeric Q.

Gate record

GateResult
complete exact production gradientPASS
component correct symmetry and boundaryPASS
fixed geometry grid and domain convergedPASS
q diagnostic complete and honestPASS
restart resources and improving trialPASS

Reproducibility artifacts

Reports, raw metrics, configurations, checkpoints, and validation data retained for this attempt.

metrics.jsonmetrics.jsonmetrics.jsonmetrics.jsongradient_metrics.jsonbenchmark_metrics.jsonq_metrics.jsonmetrics.jsonmultiprobe_response.csvpoint_metrics.jsonpoint_metrics.jsonpoint_metrics.jsonfullvector_atom_780_production_refined.json2026-08-17-production-qualification.md
← All runsRejected interpretations