Source
engines/quan_loncar_v1/package/quan_loncar_optimizer/engine/quan_loncar_series_phase53/README.md · assembled 2026-07-29 15:57 UTC.
Phase 53: separated waveguide-z1 audit¶
This phase extends the regularized cross-section Green operator from a
z-constant basis to normalized Legendre degrees 0 and 1. The qz integrals of
the longitudinal Maxwell projector are analytic; the remaining qy integral
uses the production panel rule, and Pxx + Pyy + Pzz = I closes the slow tail
exactly.
The pole transport changes only the background waveguide basis from y3-z0
to y3-z1; the local cavity basis remains P2-z0. This separation is required
before testing P2-z1 holes.